甘肅省地一體化電能量采集管理系統(tǒng)建設(shè)研究

來源:電工電氣發(fā)布時間:2018-07-24 13:24 瀏覽次數(shù):683
甘肅省地一體化電能量采集管理系統(tǒng)建設(shè)研究
 
何欣1,薛鑫2,李紅文1
(1 國網(wǎng)甘肅省電力公司電力科學(xué)研究院,甘肅 蘭州 730070;2 國網(wǎng)甘肅省電力公司,甘肅 蘭州 730050)
 
    摘 要:隨著甘肅全省110 kV以上變電站調(diào)度數(shù)據(jù)網(wǎng)實現(xiàn)全覆蓋,現(xiàn)有省調(diào)電量系統(tǒng)的數(shù)據(jù)容量已無法滿足全省110 kV廠站的接入需求,闡述了該省電能量計量系統(tǒng)的發(fā)展現(xiàn)狀,對軟硬件的配置進行了分析,并給出了省地一體化電能量采集管理系統(tǒng)升級的實施方案。通過省地一體化電能量采集管理系統(tǒng)的建設(shè),不僅擴展完善電能量采集范圍,提升電網(wǎng)模型共享的能力,同時也全面提升了電網(wǎng)運行數(shù)據(jù)的綜合運用能力與智能化管理水平。
    關(guān)鍵詞:電能量計量;擴容;同期線損
    中圖分類號:TM734     文獻標(biāo)識碼:A     文章編號:1007-3175(2018)05-0062-04
 
Research and Discussion of Integration Electric Energy Acquisition
Management System Construction in Gansu Province
 
HE Xin1, XUE Xin2, LI Hong-wen1
(1 State Grid Gansu Electric Power Research Institute, Lanzhou 730070, China;
2 State Grid Gansu Electric Power Company, Lanzhou 730050, China)
 
    Abstract: With the full coverage implementation of scheduling data of transformer substation above 110 kV in Gansu Province, the existing provincial power transmission capacity of the data system capacity has been unable to meet the provincial 110 kV plant access needs of the station. This paper expounded the development status of the provincial electric energy metering system, carried out analysis for the configuration of software and hardware and gave the implementation plan of the provincial integration electric energy acquisition management. Through the integration of provincial electric energy collection and management system construction, not only the acquisition of electric energy was expanded and improved to enhance the ability to share grid models, but also the comprehensive utilization of power grid operating data was comprehensively enhanced, as well as the intelligent management.
    Key words: electric energy metering; expansion; line loss over the same period
 
參考文獻
[1] 王孝帥,趙曉雪. 試析電能計量的信息化管理[J]. 山東工業(yè)技術(shù),2013(13) :93.
[2] 李濟生,劉偉,劉英南,等. 兗礦電能量管理系統(tǒng)的研究與應(yīng)用[J]. 煤礦現(xiàn)代化,2010(5) :76-77.
[3] 吳禮婷. 計量自動化系統(tǒng)在江門電網(wǎng)的應(yīng)用研究[D]. 廣州:華南理工大學(xué),2013.
[4] 馬強,荊銘,梁成輝. 基于CIM/CIS的省地調(diào)電網(wǎng)模型拼接與數(shù)據(jù)交換[J]. 電力自動化設(shè)備,2012,32(6) :116-119.
[5] 劉磊. 低壓客戶用電信息采集系統(tǒng)應(yīng)用研究[D]. 濟南:山東大學(xué),2012.