500 kV變壓器套管將軍帽發(fā)熱原因分析和改造

來源:電工電氣發(fā)布時間:2018-12-17 10:17 瀏覽次數(shù):668
500 kV變壓器套管將軍帽發(fā)熱原因分析和改造
 
楊雪飛,孫上元
(中國南方電網(wǎng)超高壓輸電公司柳州局,廣西 柳州 545006)
 
    摘 要:將軍帽是變壓器高壓套管的薄弱環(huán)節(jié)。對某樞紐變電站500 kV主變高壓套管將軍帽發(fā)熱的特征和產(chǎn)生原因進行分析,發(fā)現(xiàn)是高壓套管將軍帽和導電管配合螺紋接觸不良載流過熱造成的,采用帶彈性板將軍帽及使用螺栓緊固,并給出了具體的改造方法及過程,改造后,高壓套管將軍帽再未出現(xiàn)過熱,驗證了本改造方法的合理性和可靠性。
    關(guān)鍵詞:變壓器;高壓套管;將軍帽;改造
    中圖分類號:TM216;TM403.3     文獻標識碼:B     文章編號:1007-3175(2018)12-0058-03
 
Cause Analysis and Renovation of 500 kV Transformer Bushing General Cap Heating
 
YANG Xue-fei, SUN Shang-yuan
(Liuzhou Bureau of China Southern Power Grid Extra High Voltage Power Transmission Company, Liuzhou 545006, China)
 
    Abstract: The general cap is the weak link of transformer high voltage bushing. This paper analyzed the characteristics and causes of 500 kV main transformer high voltage bushing general cap heating in certain load-center substation, found that the bad contact between the high voltage bushing general cap and the contact tube matching screw thread led to the current-carrying overheating. The spring plate was adopted to fasten the general cap and the used bolt. This paper gave the concrete renovation method and process. After renovation, the high voltage bushing general cap hasn’t been overheating again, which verifies the rationality and reliability of the reconstruction method.
    Key words: transformer; high voltage bushing; general cap; renovation
 
參考文獻
[1] 文遠芳. 高電壓技術(shù)[M]. 武漢:華中科技大學出版社,2001.
[2] 曹飛翔,李友忠. 一起220 k V變壓器套管接頭發(fā)熱問題的分析及處理[J]. 變壓器,2012,49(2):75-76.
[3] 中華人民共和國電力工業(yè)部安全監(jiān)察及生產(chǎn)協(xié)調(diào)司和國家電力調(diào)度中心. 電力設(shè)備預防性試驗規(guī)程:DL/T 596—1996[S]. 北京:中國電力出版社,2000:46-47.
[4] 舒均盛. 變壓器高壓套管將軍帽檢修工藝探討[J].變壓器,2010,47(1):63-65.
[5] 張國穩(wěn),祁光勝. 主變壓器高壓套管將軍帽缺陷分析及處理[J]. 電網(wǎng)與清潔能源,2012,28(4):98-101.
[6] 中國電器工業(yè)協(xié)會. 交流電壓高于1 000 V的絕緣套管技術(shù)條件:GB/T 4109—2008[S]. 北京:中國電力出版社,2000:27-30.