儲(chǔ)能電站經(jīng)濟(jì)性及發(fā)展現(xiàn)狀分析

來源:電工電氣發(fā)布時(shí)間:2019-01-21 15:21 瀏覽次數(shù):920
儲(chǔ)能電站經(jīng)濟(jì)性及發(fā)展現(xiàn)狀分析
 
李廣洋,牛濤,閔玲
(中國能源建設(shè)集團(tuán)江蘇省電力設(shè)計(jì)院有限公司,江蘇 南京 211102)
 
    摘 要:列舉了儲(chǔ)能電站給電力系統(tǒng)中各方帶來的諸多效益,以某開展前期工作的江蘇地區(qū)鋰電池儲(chǔ)能電站為例,在給定的邊界條件下,按照《建設(shè)項(xiàng)目經(jīng)濟(jì)評(píng)價(jià)方法與參數(shù)》( 第三版) 評(píng)價(jià)其在削峰填谷的盈利模式情況下的經(jīng)濟(jì)可行性,選擇運(yùn)行策略、初始投資成本、運(yùn)營期限、度電補(bǔ)貼政策等因素進(jìn)行敏感性分析,并探討影響儲(chǔ)能產(chǎn)業(yè)發(fā)展的關(guān)鍵性因素,給出相關(guān)應(yīng)對(duì)建議。
    關(guān)鍵詞:儲(chǔ)能電站;收益分析;削峰填谷;經(jīng)濟(jì)分析;發(fā)展現(xiàn)狀
    中圖分類號(hào):TM715     文獻(xiàn)標(biāo)識(shí)碼:A     文章編號(hào):1007-3175(2019)01-0001-04
 
Analysis of Economics and Development Status of Energy Storage Power Station
 
LI Guang-yang, NIU Tao, MIN Ling
(China Energy Engineering Group Jiangsu Power Design Institute Co., Ltd, Nanjing 2111 02, China)
 
    Abstract: This paper enumerated the benefits brought by the various parties of the energy storage power station in the power system. Taking a lithium battery energy storage power station in Jiangsu as an example, under the given boundary conditions, this paper evaluated its economic feasibility in the case of peak-cutting and valley-filling profit model according to "economic evaluation method and parameters of construction projects" (3rd Edition). Sensitivity analysis was carried out by selecting factors such as operation strategy, initial investment cost, operation period and power subsidy policy etc, the key factors affecting the development of energy storage industry were discussed and the relevant suggestions were given.
    Key words: energy storage power station; income analysis; peak-cutting and valley-filling; economic analysis; development status
 
參考文獻(xiàn)
[1] 劉英軍,劉暢,王偉,等. 儲(chǔ)能發(fā)展現(xiàn)狀與趨勢分析[J]. 中外能源,2017,22(4):80-88.
[2] 陳建斌,胡玉峰,吳小辰. 儲(chǔ)能技術(shù)在南方電網(wǎng)的應(yīng)用前景分析[J]. 南方電網(wǎng)技術(shù),2010,4(6):32-36.
[3] 王建軍,黃阮明,楊增輝. 華東地區(qū)抽水蓄能電站的節(jié)能效益分析[J]. 華東電力,2012,40(4):613-616.
[4] 孫振新,劉漢強(qiáng),趙喆,等. 儲(chǔ)能經(jīng)濟(jì)性研究[J].中國電機(jī)工程學(xué)報(bào),2013,33(S1):54-58.
[5] 許弈飛,曹新雅. 動(dòng)力電池梯級(jí)利用回收模式與應(yīng)用研究[J]. 科技與創(chuàng)新,2018(9):111-112.
[6] 許守平,李相俊,惠東. 大規(guī)模電化學(xué)儲(chǔ)能系統(tǒng)發(fā)展現(xiàn)狀及示范應(yīng)用綜述[J]. 電力建設(shè),2013,34(7):73-80.