Suzhou Electric Appliance Research Institute
期刊號: CN32-1800/TM| ISSN1007-3175

Article retrieval

文章檢索

首頁 >> 文章檢索 >> 往年索引

一起GIS母線開裂故障原因分析

來源:電工電氣發(fā)布時間:2019-02-19 09:19 瀏覽次數(shù):747
一起GIS母線開裂故障原因分析
 
李玥1,孫濤2
(1 國網(wǎng)蘭州供電公司,甘肅 蘭州 730050;
2 國網(wǎng)甘肅省電力公司電力科學(xué)研究院,甘肅 蘭州 730050)
 
    摘 要:針對一起330 kV GIS母線開裂故障,介紹了故障經(jīng)過及現(xiàn)場檢查情況。從GIS母線設(shè)備應(yīng)力計算、伸縮節(jié)調(diào)節(jié)尺寸、故障母線殼體法蘭材料檢驗等方面進(jìn)行分析,得出此次設(shè)備故障原因是設(shè)備滑動支撐結(jié)構(gòu)設(shè)計不合理,殼體和伸縮節(jié)法蘭連接的螺栓緊固力矩不均勻,導(dǎo)致殼體法蘭圓周方向變形量不同,使法蘭局部產(chǎn)生應(yīng)力集中以及伸縮節(jié)選型不當(dāng)?shù)热矫嬉蛩鼐C合作用,引發(fā)了母線殼體被拉裂的故障。
    關(guān)鍵詞:GIS設(shè)備;滑動支撐;伸縮節(jié)
    中圖分類號:TM595 文獻(xiàn)標(biāo)識碼:B 文章編號:1007-3175(2019)02-0035-04
 
Failure Analysis of a Case of Gas Insulated Switchgear Busbar Cracking
 
LI Yue1, SUN Tao2
(1 State Grid Lanzhou Power Supply Company, Lanzhou 730050, China;
2 Electric Power Research Institute of Gansu Province Electric Power Company, Lanzhou 730050, China)
 
    Abstract: Aiming at a case of 330 kV gas insulated switchgear (GIS) busbar cracking failure, this paper introduced the process of failure and on-site inspection conditions and carried out analysis from the aspects of GIS busbar equipment stress calculation, expansion joint regulation size, failure busbar shell flange material examination etc to obtain that this time the cause of equipment failure is due to the unreasonable structure design of equipment sliding support and asymmetry bolt-on force of shell and expansion joint flange connections, so as to lead to the different peripheral direction deflection, to make the flange part stress concentration and to select the improper type of expansion joints etc synthesized action of three factors, which caused the failure of busbar shell cracking.
    Key words: gas insulated switchgear equipment; sliding support; expansion joint
 
參考文獻(xiàn)
[1] 李秀衛(wèi),王慶玉,毛惠卿,等. 一起組合電器內(nèi)部絕緣故障綜合分析[J]. 高壓電器,2012,48(8):99-102.
[2] 崔楊柳,馬宏忠,王濤云,等. 基于故障樹理論的GIS故障分析[J]. 高壓電器,2015,51(7):125-129.
[3] 周義博,萬四維,曾憲文,等. 一起220 kV GIS漏氣及盆式絕緣子破裂原因分析[J]. 廣東電力,2012,25(9):118-121.
[4] 陳強(qiáng),李慶民,叢浩熹,等. 引入多重邊界條件的GIS母線溫度分布多場耦合計算及影響因素分析[J]. 電工技術(shù)學(xué)報,2016,31(17):187-195.
[5] 韓明明,李清泉,劉洪順,等. 氣體絕緣變電站母線結(jié)構(gòu)參數(shù)對外殼暫態(tài)過電壓影響分析[J]. 電工技術(shù)學(xué)報,2015,30(22):239-246.
[6] 伍斯. 基于ANSYS的避雷針桿的有限元分析[D]. 武漢:湖北工業(yè)大學(xué),2012.
[7] 左亞芳.GIS設(shè)備運(yùn)行維護(hù)及故障處理[M]. 北京:中國電力出版社,2013.
[8] 羅學(xué)琛.SF6氣體絕緣全封閉組合電器(GIS)[M]. 北京:中國電力出版社,1999.
[9] 劉澤洪. 氣體絕緣金屬封閉開關(guān)設(shè)備(GIS) 質(zhì)量管理與控制[M]. 北京:中國電力出版社,2011.
[10] 鄧永輝. 高壓開關(guān)設(shè)備典型故障案例匯編(2006 ~2010 年)[M]. 北京:中國電力出版社,2013.