基于NTM的配電主站海量數(shù)據(jù)可靠性分析及應(yīng)用
艾紹偉
(許繼電氣股份有限公司 中試部,河南 許昌 461000)
摘 要:保證大數(shù)據(jù)量采集的可靠性是確保配電網(wǎng)運行的關(guān)鍵。提出了一種通過NTM(Network Time Machine) 在線分析系統(tǒng)對配電主站海量數(shù)據(jù)可靠性進(jìn)行分析的方法,給出了對主站數(shù)據(jù)可靠性進(jìn)行測試的總體思路,并對測試方法實際應(yīng)用表明,該方法可以對配電網(wǎng)的遙測數(shù)據(jù)、遙信數(shù)據(jù)進(jìn)行精確的統(tǒng)計和分析,也可以對配電網(wǎng)終端層上送主站系統(tǒng)的時延性進(jìn)行測試。
關(guān)鍵詞:配電網(wǎng);可靠性;海量數(shù)據(jù);在線分析系統(tǒng)
中圖分類號:TM711 文獻(xiàn)標(biāo)識碼:A 文章編號:1007-3175(2019)07-0055-04
Reliability Analysis and Application of NTM-Based Massive Data of Distribution Main Station
AI Shao-wei
(Intermediate Test Dept of XJ Electric Co., Ltd, Xuchang 461000, China)
Abstract: How to ensure the reliability of large data collection is the key to guarantee the operation of distribution network. This paper proposed a method to analyze the reliability of massive data of distribution master station through network time machine (NTM) online analysis system and gave the general thought testing the reliability of master station data. The practical application of this testing method shows that this method can make accurate statistics and analysis of the telemetry data and teleconference data of the distribution network, and also test the time delay of the transmission system of the main station on the terminal layer of the distribution network.
Key words: power distribution network; reliability; mass data; online analysis system
參考文獻(xiàn)
[1] 劉健,倪建立,鄧永輝. 配電自動化系統(tǒng)[M]. 北京:中國水利水電出版社,2009.
[2] 馮慶東,毛為民. 配電網(wǎng)自動化技術(shù)與工程實例分析[M]. 北京:中國電力出版社,2009.
[3] 張沛超,高翔. 數(shù)字化變電站系統(tǒng)結(jié)構(gòu)[J]. 電網(wǎng)技術(shù),2006,30(24):73-77.
[4] 陳堂,趙祖康,陳星鶯,胡大良. 配電系統(tǒng)及其自動化技術(shù)[M]. 北京:中國電力出版社,2009.
[5] 趙祖康,徐石明. 電力系統(tǒng)信息傳輸協(xié)議綜述[J]. 電力系統(tǒng)自動化,2000,24(22):65-71.
[6] 王士政. 電網(wǎng)調(diào)度自動化與配網(wǎng)自動化技術(shù)[M]. 北京:中國水利水電出版,2008.
[7] 吳在軍,胡敏強. 基于IEC 61850標(biāo)準(zhǔn)的變電站自動化系統(tǒng)研究[J]. 電網(wǎng)技術(shù),2003,27(10):61-65.