大型受端城市電網(wǎng)黑啟動電源規(guī)劃研究

來源:電工電氣發(fā)布時間:2020-10-23 14:23 瀏覽次數(shù):689
大型受端城市電網(wǎng)黑啟動電源規(guī)劃研究
 
郭挺,高艷娜,朱志芳,董紅
(廣東電網(wǎng)有限責任公司廣州供電局,廣東 廣州 510620)
 
    摘 要:廣州電網(wǎng)負荷密集,交直流混聯(lián)運行特性復雜,局部故障引發(fā)大面積停電風險日益凸顯。以恢復重要用戶供電和盡快啟動近區(qū)主力電廠為目標,提出了黑啟動電源布局規(guī)劃的基本原則。給出了表征恢復速度的黑啟動恢復級數(shù)實用化指標,探索了常規(guī)氣電機組、現(xiàn)有機組加裝儲能、煤電機組FCB改造及柔直背靠背互聯(lián)等4 種方式的黑啟動電源規(guī)劃方案,并評估了“十四五”期間廣州電網(wǎng)的黑啟動能力,對指導大型受端城市電網(wǎng)黑啟動電源規(guī)劃具有一定的借鑒意義。
    關鍵詞:黑啟動;電源規(guī)劃;故障恢復級數(shù)
    中圖分類號:TM715     文獻標識碼:A     文章編號:1007-3175(2020)10-0058-04
 
Research on Black Start Power Source Planning in Large City Received-End Power Grid
 
GUO Ting, GAO Yan-na, ZHU Zhi-fang, DONG Hong
(Guangzhou Power Supply Bureau of Guangdong Power Grid Co., Ltd, Guangzhou 510620, China)
 
    Abstract: Guangzhou is the larger load center in the power grid, the AC/DC hybrid operation characteristics are complex, and the risk of large-area power outage caused by local fault is increasingly prominent. To restore the power supply of important users and start the main power plants in the near area as soon as possible, the basic principles of black start power planning are proposed. The fault recovery steps index of black is given, representing the recovery speed. Four types of black start power planning schemes are explored, including conventional gas turbine units, existing units with energy storage, FCB transformation of coal-fired power unit and back-to-back VSC HVDC interconnection. The black start capability of Guangzhou Power Grid during the "14th five year plan" period is evaluated, which has certain reference significance for guiding the black start power planning of large receiving end city power grid.
    Key words: black start; power planning; fault recovery steps index
 
參考文獻
[1] 印永華,郭劍波,趙建軍,等. 美加“8·14”大停電事故初步分析以及應吸取的教訓[J]. 電網(wǎng)技術,2003,27(10):8-11.
[2] 唐斯慶,張彌,李建設,等. 海南電網(wǎng)“9·26”大面積停電事故的分析與總結[J]. 電力系統(tǒng)自動化,2006,30(1):1-7.
[3] 童曉陽,王曉茹. 烏克蘭停電事件引起的網(wǎng)絡攻擊與電網(wǎng)信息安全防范思考[J]. 電力系統(tǒng)自動化,2016,40(7):144-148.
[4] 劉棟,孫英云. 基于社會效益最大化的黑啟動電源規(guī)劃[J]. 電力系統(tǒng)自動化,2009,33(12):17-21.
[5] 趙昱宣,孫磊,林振智,等. 微網(wǎng)作為黑啟動電源的電力系統(tǒng)網(wǎng)架重構優(yōu)化策略[J]. 電力系統(tǒng)自動化,2018,42(17):9-17.
[6] 孫磊,張璨,林振智,等. 計及電動汽車充電站作為黑啟動電源的網(wǎng)架重構優(yōu)化策略[J]. 電力系統(tǒng)自動化,2015,39(14):75-81.
[7] 周云,嚴正,李乃湖,等. 考慮恢復時間模型的電力系統(tǒng)黑啟動策略[J]. 電工電能新技術,2015,34(2):13-19.
[8] 周劍,黃磊,劉春曉,等. 基于魯西背靠背柔性直流系統(tǒng)的南方電網(wǎng)黑啟動方案[J]. 南方電網(wǎng)技術,2017,11(6):8-14.
[9] 趙達維,劉天琪,李興源,等. 電網(wǎng)黑啟動方案評價指標體系及應用[J]. 電力系統(tǒng)自動化,2012,36(21):7-12.