一起發(fā)電廠10 kV互感器柜過電壓保護(hù)器爆炸事故的分析

來源:電工電氣發(fā)布時(shí)間:2021-02-22 15:22 瀏覽次數(shù):756

一起發(fā)電廠10 kV互感器柜過電壓保護(hù)器爆炸事故的分析

楊慶賀
(中國(guó)大唐集團(tuán)科學(xué)技術(shù)研究院有限公司華東電力試驗(yàn)研究院,安徽 合肥 230088)
 
    摘 要:以某電廠10 kV輸煤空壓機(jī)A 段母線電壓互感器柜發(fā)生爆炸引起10 kVA段進(jìn)線開關(guān)跳閘為例,論述了電壓互感器柜內(nèi)過電壓保護(hù)器發(fā)生爆炸及故障發(fā)展的全過程。經(jīng)過對(duì)繼電保護(hù)波形分析、電壓互感器柜爆炸現(xiàn)場(chǎng)檢查及過電壓保護(hù)器的破拆結(jié)果觀察,綜合判斷本次10 kV母線電壓互感器柜發(fā)生爆炸的直接原因?yàn)楣駜?nèi)過電壓保護(hù)器發(fā)生電弧放電,引起A相、B相相間短路,進(jìn)而導(dǎo)致三相母排之間發(fā)生短路,短路產(chǎn)生的電弧將母排和母線連接柜金屬隔板燒損。為防類似事故再次發(fā)生,給出了防范措施。
    關(guān)鍵詞:開關(guān)柜;過電壓保護(hù)器;三相四柱式;金屬氧化物避雷器
    中圖分類號(hào):TM451     文獻(xiàn)標(biāo)識(shí)碼:B     文章編號(hào):1007-3175(2021)02-0040-04
 
Analysis of an Explosion of 10 kV Transformer Cabinet Overvoltage Protective Devices in Power Station
 
YANG Qing-he
(China Datang Corporation Science and Technology Research Institute Co., Ltd, East China Electric Power Test
Research Institute, Hefei 230088, China)
 
    Abstract: Taking a power plant's 10 kV coal conveying air compressor A section busbar voltage transformer cabinet that exploded, causing the 10 kV A section incoming switch to trip as an example, the whole process of explosion and failure development of the overvoltage protector in the voltage transformer cabinet is discussed. After analyzing the waveform of the relay protection, on-site inspection of the explosion of the voltage transformer cabinet and the observation of the overvoltage protector, it is comprehensively judged that the direct cause of the explosion of the 10 kV busbar voltage transformer cabinet is the occurrence of arc discharge in the overvoltage protector in the cabinet.The arc discharge causes a short circuit between phases A and B, which in turn causes a short circuit among the three-phase busbars. The arc generated by the short circuit burns the metal partitions of the busbar and the busbar connection cabinet. This article gives preventive measures to prevent similar accidents from happening again.
    Key words: switchgear; overvoltage protector; three-phase four column; metal oxide arrester
 
參考文獻(xiàn)
[1] 王朝陽,李長(zhǎng)江. 某35 kV變電站TBP過電壓保護(hù)器爆炸原因分析及措施[C]// 河南省煤炭學(xué)會(huì)第六屆機(jī)電專業(yè)委員會(huì)年會(huì),2009:331-332.
[2] 唐新文,李憲棟,沙林,等. TBP型過電壓保護(hù)器現(xiàn)場(chǎng)試驗(yàn)方法探討[C]//2008 年全國(guó)水電自動(dòng)化技術(shù)學(xué)術(shù)交流會(huì),2008:1-2.
[3] 吳亮,王軒昊. 三相組合式過電壓保護(hù)器動(dòng)作負(fù)載試驗(yàn)方法分析[J]. 電瓷避雷器,2019(3):78-82.
[4] 戈寶石,翟文華. 一起過電壓保護(hù)器放炮事故的分析[J]. 冶金與材料,2020,40(2):172-173.
[5] 林佑祥,高智群. 過電壓保護(hù)器的分析與應(yīng)用[J].自動(dòng)化與儀器儀表,2014(10):80-81.
[6] 閆科,嚴(yán)國(guó)慶,顧光鎰,等. 過電壓保護(hù)器使用現(xiàn)狀分析[J]. 純堿工業(yè),2011(3):15-16.
[7] 楊立斌,李瑞遠(yuǎn),李春麗. 過電壓保護(hù)器絕緣擊穿引起短路事故分析[J]. 氯堿工業(yè),2020,56(3):11-12.
[8] 李錦鵬,郭思君. 組合式過電壓保護(hù)器技術(shù)性能分析[J]. 工礦自動(dòng)化,2004(1):44-46.
[9] 姜俊莉,楊軍,劉占榮,等. 三相組合式過電壓保護(hù)器工頻放電電壓試驗(yàn)的分析[J] . 電瓷避雷器,2004(4):36-38.
[10] 羅青.10 kV線路過電壓保護(hù)器的運(yùn)維與故障原因分析[J]. 百科論壇電子雜志,2019(21):208.