10 kV配網(wǎng)自動(dòng)化系統(tǒng)中故障定位隔離技術(shù)研究

來(lái)源:電工電氣發(fā)布時(shí)間:2022-01-20 10:20 瀏覽次數(shù):569

10 kV配網(wǎng)自動(dòng)化系統(tǒng)中故障定位隔離技術(shù)研究

王冬
(國(guó)網(wǎng)河北省電力有限公司泊頭市供電分公司,河北 泊頭 061000)
 
    摘 要:因縣域內(nèi) 10 kV 線路長(zhǎng)、分支線多、各段線路型號(hào)差異較大,速斷定值無(wú)法準(zhǔn)確設(shè)置,造成線路故障時(shí),分段開(kāi)關(guān)無(wú)法準(zhǔn)確動(dòng)作,擴(kuò)大了停電范圍。介紹了配網(wǎng)自動(dòng)化系統(tǒng)的組成框架,對(duì)目前配網(wǎng)自動(dòng)化系統(tǒng)中故障定位隔離存在的問(wèn)題進(jìn)行了闡述,并給出了基于饋線終端 (FTU) 縱聯(lián)差動(dòng)的故障定位隔離方案和基于矩陣運(yùn)算的故障定位隔離方案,所述方案能夠充分發(fā)揮 FTU 與集控主站的負(fù)荷監(jiān)控和高速通信功能,實(shí)現(xiàn)配網(wǎng)故障準(zhǔn)確定位、快速隔離,縮小線路停電范圍,保障非故障區(qū)域電力的正常供應(yīng),提升了配電網(wǎng)線路的運(yùn)行管理水平。
    關(guān)鍵詞:配網(wǎng)自動(dòng)化;故障定位隔離;饋線終端(FTU) ;縱聯(lián)差動(dòng);矩陣運(yùn)算
    中圖分類號(hào):TM711     文獻(xiàn)標(biāo)識(shí)碼:A     文章編號(hào):1007-3175(2022)01-0042-03
 
Research on Fault Location and Isolation Technology in 10 kV
Distribution Network Automation System
 
WANG Dong
(Botou City Power Supply Branch of State Grid Hebei Electric Power Co., Ltd, Botou 061000, China)
 
    Abstract: In the county-level region, some problems exist in the 10 kV circuit. For example, the length is too long, the branch-line is too many, there are excessive different types of circuits. Those problems can lead to some issues. For instance, when the section-speed setting value could not be set up accurately and triggered the line fault, it might lead to the sectioned switch cannot operate correctly. It would eventually cause widespread power failure. This paper introduced the structure of distributing electric power automation systems, elaborated on the existing matters of the fault section location and isolation problem in distributing electric power automation systems. The research proposed two plans. One is the fault section location and isolation plan based on the FTU longitudinal differential; another is the fault section location and isolation plan based on matrix computation. Both plans could develop the electric power load monitoring and high-speed communication function of the FTU and centralized control station and help to improve the operation and management level of the distribution network from many aspects. Both plans could develop the electric power load monitoring and high-speed communication function of the FTU and centralized control station. They could help to improve the operation and management level of the distribution network from many aspects. For instance, they can realize the accurate location of the network configuration fault, trigger the isolation of network faults rapidly,reduce the scope of power outages, and ensure the supply of power in non-faulty areas.
    Key words: distribution network automation; fault location isolation; FTU; longitudinal differential; matrix operation
 
參考文獻(xiàn)
[1] 林波.10 kV 配網(wǎng)自動(dòng)化系統(tǒng)建設(shè)與規(guī)劃[J] . 中國(guó)高新科技,2019,4(19) :76-78.
[2] 劉玉寶. 配網(wǎng)自動(dòng)化故障定位問(wèn)題的研究及應(yīng)用[J].通信電源技術(shù),2019,36(12) :52-53.
[3] 全業(yè)生, 徐鐘祝, 余陽(yáng), 趙海龍. 配網(wǎng)故障定位方法研究[J] . 現(xiàn)代工業(yè)經(jīng)濟(jì)和信息化,2018,8(13) :123-124.
[4] 李勛,陶紅華,鐘聲,肖隆恩,陳堂. 應(yīng)用于分布式智能 FA 的區(qū)域差動(dòng)保護(hù)實(shí)現(xiàn)機(jī)制的研究[J]. 農(nóng)村電氣化,2019(8) :54-57.
[5] 唐群綱,林景棟,宋潔. 一種基于 FTU 的配網(wǎng)故障定位矩陣單元化算法[J] . 重慶大學(xué)學(xué)報(bào) (自然科學(xué)版),2006,4(5) :128-131.