Suzhou Electric Appliance Research Institute
期刊號(hào): CN32-1800/TM| ISSN1007-3175

Article retrieval

文章檢索

首頁(yè) >> 文章檢索 >> 往年索引

縮短10 kV開(kāi)關(guān)柜接地線裝設(shè)時(shí)間的研究

來(lái)源:電工電氣發(fā)布時(shí)間:2022-08-29 08:29 瀏覽次數(shù):387

縮短10 kV開(kāi)關(guān)柜接地線裝設(shè)時(shí)間的研究

張一杰,岳廣偉,李衛(wèi)軍
(國(guó)網(wǎng)河南省電力公司駐馬店供電公司,河南 駐馬店 463000)
 
    摘 要:為了縮短 10 kV 開(kāi)關(guān)柜接地線裝設(shè)時(shí)間,根據(jù)變電站倒閘操作現(xiàn)場(chǎng)實(shí)際流程,對(duì)現(xiàn)有安全工器具進(jìn)行了改進(jìn)并縮短了操作時(shí)間。使用關(guān)聯(lián)圖對(duì)影響操作時(shí)間的主要問(wèn)題進(jìn)行分析,并對(duì) 6 條末端因素逐條分析確認(rèn),確定螺旋發(fā)力導(dǎo)致導(dǎo)體端難以固定是主要因素,通過(guò)借鑒剝線鉗彈簧結(jié)構(gòu),制作新型結(jié)構(gòu)的開(kāi)關(guān)柜接地線,大幅縮短固定導(dǎo)體端時(shí)間,從而縮短了 10 kV 開(kāi)關(guān)柜接地線整體裝設(shè)時(shí)間,并在實(shí)際操作中得到了驗(yàn)證。
    關(guān)鍵詞: 開(kāi)關(guān)柜;接地線;螺旋;彈簧結(jié)構(gòu)
    中圖分類號(hào):TM591     文獻(xiàn)標(biāo)識(shí)碼:B     文章編號(hào):1007-3175(2022)08-0063-04
 
Exploration and Research on Shortening Installation Time of
Ground Wire for 10 kV Switchgear
 
ZHANG Yi-jie, YUE Guang-wei, LI Wei-jun
(Zhumadian Power Supply Company, State Grid Henan Electric Power Company, Zhumadian 463000, China)
 
    Abstract: This research improved the existing safety tools and reduced the operation time according to the actual process of switching operation in the substation to shorten the installation time of the ground wire of the 10 kV switchgear.It used the correlation diagram to analyze prime problems and examine 6 terminal reasons. After analysis, it determined the fundamental reason is that the end of the conductor is difficult to fix because of the spiral force. This study drew lessons from the stripping spring structure and created a new type of ground wire of switchgear. The result shows that the new design significantly shortens the time of fixing the end of the conductor. The practical operation verifies that the improvement could help decrease the installation time of the ground wire of 10 kV switchgear.
    Key words: switchgear; ground wire; spiral; spring structure
 
參考文獻(xiàn)
[1] 邵敏敏. 淺析變電運(yùn)維人員倒閘操作效率提升措施[J]. 現(xiàn)代營(yíng)銷(經(jīng)營(yíng)版),2009(11) :132.
[2] 鄭攀登,施洋,鄭元慶,等. 機(jī)組倒閘操作耗時(shí)較長(zhǎng)原因分析及處理[J]. 紅水河,2022,41(2) :121-124.
[3] 蔣軍,吳亨. 變電站倒閘操作方式的優(yōu)化及測(cè)試方案設(shè)計(jì)[J]. 電工技術(shù),2021(6) :131-133.
[4] 雷輝. 變電運(yùn)維人員倒閘操作效率提升策略[J] .花炮科技與市場(chǎng),2019(2) :52.
[5] 陳廣錫. 一種通用型開(kāi)關(guān)柜靜觸頭接地線的設(shè)計(jì)[J].集成電路應(yīng)用,2022,39(2) :148-149.
[6] 蔡祖建,林華盛,焦康. 一種便攜式接地線連接頭的研制[J] . 電子元器件與信息技術(shù),2021,5(11) :41-42.
[7] 許超華. 新型多角度接地線棒研究[J] . 機(jī)電信息,2021(26) :38-39.
[8] 吳曉媛. 降低接地線裝設(shè)不規(guī)范率[J] . 科技創(chuàng)新導(dǎo)報(bào),2019(13) :8-9.
[9] 葉宇峰,何春光,盧志明,等. 縮短10 kV 環(huán)網(wǎng)柜接地線掛設(shè)時(shí)間的研究[J]. 電工技術(shù),2015(6) :1-2.
[10] 梁海霞. 接地線裝設(shè)操作步驟問(wèn)題探討[J] . 農(nóng)村電工,2015,23(2) :24.
[11] 劉松喜,陳杰. 通用性接地裝置的研制及其應(yīng)用[J].電力設(shè)備,2008,9(10) :71-73.