一起500 kV氣體絕緣開(kāi)關(guān)閃絡(luò)事故的處理分析

來(lái)源:電工電氣發(fā)布時(shí)間:2016-04-06 14:06 瀏覽次數(shù):14

一起500 kV氣體絕緣開(kāi)關(guān)閃絡(luò)事故的處理分析 

王偉1,張彥2,曲文韜3

1 國(guó)網(wǎng)山東省電力公司經(jīng)濟(jì)技術(shù)研究院,山東 濟(jì)南 250021;2 國(guó)網(wǎng)技術(shù)學(xué)院,山東 濟(jì)南 250002;
3 國(guó)網(wǎng)山東省電力公司檢修公司,山東 濟(jì)南 250001
 
 

摘 要:介紹了一起500 kV氣體絕緣開(kāi)關(guān)(GIS)設(shè)備的絕緣事故,分析了其應(yīng)急處置及搶修方案,并通過(guò)對(duì)放電痕跡和物質(zhì)的分析推測(cè)了事故原因,該事故是因設(shè)備裝備過(guò)程中殼體法蘭面和絕緣盆環(huán)氧樹(shù)脂面的間隙混入金屬異物,由于設(shè)備振動(dòng)導(dǎo)致異物位置偏移引起電場(chǎng)變化,致使閃絡(luò)事故的發(fā)生。指出應(yīng)嚴(yán)格現(xiàn)場(chǎng)施工質(zhì)量管控,保證設(shè)備安裝質(zhì)量,確保電網(wǎng)安全穩(wěn)定運(yùn)行。
關(guān)鍵詞:氣體絕緣開(kāi)關(guān)設(shè)備;閃絡(luò);事故處理
中圖分類(lèi)號(hào):TM591;TM855 文獻(xiàn)標(biāo)識(shí)碼:B 文章編號(hào):1007-3175(2014)10-0034-03


Disposal and Analysis of 500 kV Gas Insulated Switchgear Flashover Accident 

WANG Wei1, ZHANG Yan2, QU Wen-tao3 
1 Shandong Electric Power Economic Research Institute, Jinan 250021, China; 
2 State Grid of China Technology College, Jinan 250002, China; 3 Shandong Electric Power Maintenance Company, Jinan 250001, China)
 
 

Abstract: Introduction was made to an insulation accident of 500 kV gas insulated switchgear (GIS) equipment. This paper analyzed its emergency disposal and strategy management and determined accident causes via discharge track and material analysis. The accident was due to metal foreign objects mixed into the clearance between casing flange and insulation basin epoxy during equipment installation process. The vibration of the equipment caused foreign object position displacement with electric field change and thus flashover accident took place. It is pointed out that construction on site should be with strict quality management and control, to ensure equipment installation quality and to guarantee power grid in safe and stable operation.
           Key words: gas insulated switchgear; flashover; accident disposal


參考文獻(xiàn)
[1] 羅學(xué)琛.SF6氣體絕緣全封閉組合電器(GIS)[M].北京:中國(guó)電力出版社,2009. 
[2] 王偉,馮新巖,曲文韜,等.超聲波法在GIS局部放電檢測(cè)中的應(yīng)用[J].電氣技術(shù),2010(7):38-41.
[3] 徐世山,孟可風(fēng),劉文泉.一起363 kV GIS充電閃絡(luò)故障的原因分析[J].高壓電器,2007,43(1):74-76.
[4] 楊振宇,何正興,俞澄一.晉陵變220kVGIS的漏氣檢修及其相關(guān)問(wèn)題[J].高壓電器,2010,46(6):93-97.