海陽核電常規(guī)島動力電纜端接問題的處理研究
宋光耀
(山東核電有限公司,山東 煙臺 265116)
摘 要:針對海陽核電一期工程現(xiàn)場出現(xiàn)了大截面動力電纜在電機接線盒內(nèi)無法端接施工的問題,介紹了美國標準和國家標準選擇電纜的不同計算過程,對比了標準之間的差異,并對產(chǎn)生端接問題的原因進行了分析,提出通過更換接線盒、增加轉(zhuǎn)接箱等措施來解決端接問題。
關(guān)鍵詞:電纜端接;電纜截面;壓降校核;資料交換
中圖分類號:TM247 文獻標識碼:A 文章編號:1007-3175(2016)12-0056-04
Research on Power Cable Termination in Conventional Island of
Haiyang Nuclear Power Plant
SONG Guang-yao
(Shandong Nuclear Power Company Ltd, Yantai 26511 6, China)
Abstract: In allusion to the problem that in Haiyang nuclear power project site the power cable with big section can not terminate in motor junction box, this paper introduced the different computational process of power cable selection between American standard and national standard and compared the differences between the standards. The cause producing the terminating problem was carried out analysis. This paper proposed to change the junction box to increase the transfer box etc measures to solve the terminating problem.
Key words: cable terminal; cable section; voltage drop check; data exchange
參考文獻
[1] GB 50217—2007 電力工程電纜設(shè)計規(guī)范[S].
[2] 郭云霞. 電力電纜截面選擇初探[J]. 上海電力學院學報,2007,23(2):123-126.