基于建筑信息模型的電網(wǎng)工程建設(shè)管理研究與應(yīng)用
孫擎宇,鄒新梧,李俊元
(國網(wǎng)天津 市電力公司,天津 300010)
摘 要:基于電網(wǎng)工程信息模型,將建筑信息模型(BIM)應(yīng)用于電網(wǎng)工程建設(shè)過程,以三維建模、計(jì)算機(jī)仿真、數(shù)字模型優(yōu)化和虛擬現(xiàn)實(shí)四種處理形式為載體構(gòu)建軟件系統(tǒng),來實(shí)現(xiàn)電網(wǎng)建設(shè)的具體業(yè)務(wù)應(yīng)用,并從現(xiàn)場管理和數(shù)據(jù)管理兩個(gè)維度提升電網(wǎng)工程建設(shè)管理水平,應(yīng)用案例表明,該方法實(shí)現(xiàn)了進(jìn)度、安全、質(zhì)量、技術(shù)、造價(jià)等專業(yè)管理的全面提升,提高了電力企業(yè)工程項(xiàng)目的管理水平。
關(guān)鍵詞:電網(wǎng)工程;建筑信息模型(BIM);現(xiàn)場管理;數(shù)據(jù)管理
中圖分類號(hào):TM73 文獻(xiàn)標(biāo)識(shí)碼:B 文章編號(hào):1007-3175(2017)09-0063-04
Research and Application of Power Grid Project Construction Based on Building Information Model
SUN Qing-yu, ZOU Xin-wu, LI Jun-yuan
(State Grid Tianjin Power Supply Company, Tianjin 300010, China)
Abstract: Based on the power grid project information model, this paper applied the building information model (BIM) to the process of the power grid project construction, took four kind of disposal modes of a three-dimensional model, computer simulation, digital model optimization and virtual reality as the carrier to construct the software system to realize the concrete business application of the power grid construction, and raised the power grid project construction management level of two dimensions including field management and data administration. The application case shows that this method realizes comprehensive improvement in respects of schedule, safety, quality, technology and cost etc professional management and improves the management level of power enterprise engineering project.
Key words: power grid project; building information model; field management; data administration
參考文獻(xiàn)
[1] 趙建保,丁亞偉,王東海,常豫洲.電網(wǎng)工程建設(shè)項(xiàng)目進(jìn)度管理中的問題及解決辦法[J].科技風(fēng),2009(21):106-107.
[2] 潘紅芳.內(nèi)蒙古電網(wǎng)工程建設(shè)項(xiàng)目全過程管理系統(tǒng)研究與應(yīng)用[D].保定:華北電力大學(xué),2009.
[3] 劉宏志,屠慶波,高靜仁,李彥.基于BIM 技術(shù)的電網(wǎng)工程造價(jià)管理應(yīng)用模式研究[J].陜西電力,2016,44(11):66-71.
[4] 靳家佳.建筑信息模型在建設(shè)工程項(xiàng)目中的應(yīng)用模式研究[J].數(shù)學(xué)技術(shù)與應(yīng)用,2012(8):218.
[5] 孟森,劉欣,張世洋.淺談基于BIM 的工程造價(jià)管理[J].工程建設(shè),2012,44(5):74-78.